Steel brackets for façade and metal fabricators, 27 MT+
Blast cleaning, Jotun Penguard primers and Hardtop topcoats up to a C5-M specification, with dry-film thickness checked and a coating certificate for every batch.
Protective and anti-corrosion coating systems for storage tanks, pipework, steel structures and plant, and GRP lining, applied at our Al Sajaa workshop in Sharjah or on site.
Storage tanks, pipework, steel structures, brackets and fabricated steel for façade and metal fabricators, and plant items. Water tanks can be lined with GRP.
Surface preparation including blast cleaning, then primers and topcoats applied to the specified dry-film thickness. DFT is measured and recorded, and we issue inspection records with the work.
Smaller steel items come to our Al Sajaa workshop, where batches are blasted, coated, cured and checked. Tanks, pipework and structures are coated on site.
Full PPE on every site, a daily toolbox talk before work starts, a risk assessment and method statement for every scope, and barricades, signage and permits around your operations.
Blast cleaning, Jotun Penguard primers and Hardtop topcoats up to a C5-M specification, with dry-film thickness checked and a coating certificate for every batch.
Our own site photos. References are available on request with the client's permission.
Yes. Dry-film thickness is checked and recorded, and on our steel bracket work a coating certificate is issued for every batch.
Yes. We inspect, measure and test on site, then send an itemised quotation naming the system, method and programme. VAT is shown separately.
Yes. We phase work around live operations, with barricades, signage and permits, and we can plan night or weekend shifts where needed.
We aim to reply within 24 working hours with a survey date or a quotation.
We aim to reply within 24 working hours with a survey date or a quotation.