What these projects have in common
Each job was surveyed on site before it was priced, and each was carried out by our own crews rather than subcontracted. The floors cover very different settings: an airport parking bay delivered as specialist subcontractor, a manufacturer's warehouse, and a factory that kept working while we ground, coated and line-marked its floor. The steel bracket package ran batch by batch through our Al Sajaa workshop with a coating certificate issued for every batch.
How we deliver a project like these
- Site survey. We inspect, measure and test on site before pricing anything.
- Quotation. Itemised scope, named system, method and programme. VAT shown separately.
- Execution. Our own crews, Monday to Saturday, phased around your operations, with full PPE, a daily toolbox talk, and a risk assessment and method statement for every scope.
- Handover. Joint inspection, snag closure and handover documents, with the warranty terms set out in the quotation.
Systems used on our floors and coatings
We apply Sika, Fosroc and Jotun systems to the manufacturer's specification. Our application team completed Sika U.A.E.'s Basic Application Training for Sikafloor® MultiFlex Traffic 1330 and Sikafloor®-1205 on 31 December 2025. This is basic application training; Z-Link is not a Sika approved applicator. On the steel bracket project we used Jotun Penguard primers and Hardtop topcoats, with dry-film thickness checked on every batch.
Sectors we serve
We work for facilities managers, property owners, factories and main contractors across the Emirates: industrial and warehouse buildings, commercial towers and car parks, residential communities, logistics and distribution centres, and planned and reactive facilities management works.