Request a quote
Home Projects
Recent projects

Projects we have delivered in Dubai and Sharjah

Our own site photos from completed work. Clients are described by type, and references are available on request with their permission.

Z-Link crew laying anti-slip epoxy at an airport parking bay in Dubai SouthZ-Link crew laying anti-slip epoxy at an airport parking bay in Dubai South, work in progressZ-Link crew laying anti-slip epoxy at an airport parking bay in Dubai South, detail
Epoxy flooring · Dubai South

Airport vehicle parking bay, 1,900 m²

Anti-slip epoxy with aggregate broadcast at Al Maktoum International Airport (DWC), delivered as specialist subcontractor.

What we did

  • Surface preparation of the parking bay slab
  • Epoxy coating with aggregate broadcast for an anti-slip finish
  • Work delivered as specialist subcontractor on an airport site

Service: Epoxy Flooring

Finished glossy epoxy floor in a Sharjah factory warehouseFinished glossy epoxy floor in a Sharjah factory warehouse, work in progressFinished glossy epoxy floor in a Sharjah factory warehouse, detail
Epoxy flooring · Industrial Area 5, Sharjah

Film factory warehouse, 1,250 m²

Industrial epoxy floor for a film manufacturer's warehouse, completed in 2025.

What we did

  • Industrial epoxy floor across a 1,250 m² warehouse
  • Glossy finish suited to a manufacturing warehouse
  • Completed in 2025

Service: Epoxy Flooring

Factory floor with new epoxy and yellow line marking in SharjahFactory floor with new epoxy and yellow line marking in Sharjah, work in progressFactory floor with new epoxy and yellow line marking in Sharjah, detail
Epoxy flooring · Industrial Area 15, Sharjah

Factory floor upgrade in a live factory

Diamond grinding, epoxy coating and yellow safety line marking inside a working factory.

What we did

  • Diamond grinding of the existing floor
  • Epoxy coating applied inside a working factory
  • Yellow safety line marking

Service: Epoxy Flooring

Coated steel brackets on drying racks at the Z-Link workshopCoated steel brackets on drying racks at the Z-Link workshop, work in progressCoated steel brackets on drying racks at the Z-Link workshop, detail
Industrial coatings · Al Sajaa workshop

Steel brackets for façade and metal fabricators, 27 MT+

Blast cleaning, Jotun Penguard primers and Hardtop topcoats up to a C5-M specification, with dry-film thickness checked and a coating certificate for every batch.

What we did

  • Blast cleaning of each batch at our Al Sajaa workshop
  • Jotun Penguard primers and Hardtop topcoats up to a C5-M specification
  • Dry-film thickness checked and a coating certificate issued for every batch

Service: Industrial Coatings

What these projects have in common

Each job was surveyed on site before it was priced, and each was carried out by our own crews rather than subcontracted. The floors cover very different settings: an airport parking bay delivered as specialist subcontractor, a manufacturer's warehouse, and a factory that kept working while we ground, coated and line-marked its floor. The steel bracket package ran batch by batch through our Al Sajaa workshop with a coating certificate issued for every batch.

How we deliver a project like these

  1. Site survey. We inspect, measure and test on site before pricing anything.
  2. Quotation. Itemised scope, named system, method and programme. VAT shown separately.
  3. Execution. Our own crews, Monday to Saturday, phased around your operations, with full PPE, a daily toolbox talk, and a risk assessment and method statement for every scope.
  4. Handover. Joint inspection, snag closure and handover documents, with the warranty terms set out in the quotation.

Systems used on our floors and coatings

We apply Sika, Fosroc and Jotun systems to the manufacturer's specification. Our application team completed Sika U.A.E.'s Basic Application Training for Sikafloor® MultiFlex Traffic 1330 and Sikafloor®-1205 on 31 December 2025. This is basic application training; Z-Link is not a Sika approved applicator. On the steel bracket project we used Jotun Penguard primers and Hardtop topcoats, with dry-film thickness checked on every batch.

Sectors we serve

We work for facilities managers, property owners, factories and main contractors across the Emirates: industrial and warehouse buildings, commercial towers and car parks, residential communities, logistics and distribution centres, and planned and reactive facilities management works.

Questions clients ask

Can we speak to a client about past work?

References are available on request, with the client's permission.

Are these photos of your own work?

Yes. The project photos on this page are our own site photos from completed jobs. Stock images elsewhere on the site are credited to Unsplash.

Can you lay an epoxy floor while our factory keeps running?

Yes. Our Industrial Area 15 job was done inside a working factory. We phase areas so operations continue, with barricades and signage, and can plan night or weekend shifts.

Do you issue coating records?

Yes. On our steel bracket work, dry-film thickness was checked and a coating certificate was issued for every batch.

How quickly will you respond?

We aim to reply within 24 working hours with a survey date or a quotation.

Tell us about your site.

We aim to reply within 24 working hours with a survey date or a quotation.