Airport vehicle parking bay, 1,900 m²
Anti-slip epoxy with aggregate broadcast at Al Maktoum International Airport (DWC), delivered as specialist subcontractor.
Hard-wearing epoxy floors for car parks, warehouses, factories and food areas, with self-levelling and anti-slip finishes, coving and safety line marking, laid by our own crews.
Warehouse and logistics floors, factory production areas, car parks and ramps, walkways and food-area floors. We match the system to the traffic: forklifts and pallet trucks, cars, foot traffic or wet processes.
We diamond-grind or otherwise prepare the concrete, repair cracks and joints, then apply primer and the specified build. Anti-slip floors get an aggregate broadcast; coving, line marking and bay marking are finished in the same programme.
Most of our floors are laid in buildings that keep running. We phase areas so operations continue, with barricades and signage, and plan night or weekend shifts where needed.
Our application team completed Sika U.A.E.'s Basic Application Training for Sikafloor® MultiFlex Traffic 1330 and Sikafloor®-1205 on 31 December 2025. This is basic application training; Z-Link is not a Sika approved applicator.
Full PPE on every site, a daily toolbox talk before work starts, a risk assessment and method statement for every scope, and barricades, signage and permits around your operations.
Anti-slip epoxy with aggregate broadcast at Al Maktoum International Airport (DWC), delivered as specialist subcontractor.
Industrial epoxy floor for a film manufacturer's warehouse, completed in 2025.
Diamond grinding, epoxy coating and yellow safety line marking inside a working factory.
Our own site photos. References are available on request with the client's permission.
Yes. We split the floor into phases so the rest of the building keeps working, and we can schedule night or weekend shifts.
Yes. We inspect, measure and test on site, then send an itemised quotation naming the system, method and programme. VAT is shown separately.
Yes. We phase work around live operations, with barricades, signage and permits, and we can plan night or weekend shifts where needed.
We aim to reply within 24 working hours with a survey date or a quotation.
We aim to reply within 24 working hours with a survey date or a quotation.